Olga Online uses live production data to reveal the multiphase flow behavior of the wells, pipelines and network in real-time.
Flow Assurance Criticalities and Challenges Management in Zohr Gas Field
已发表: 10/28/2021
Flow Assurance Criticalities and Challenges Management in Zohr Gas Field
已发表: 10/28/2021
In this World Oil article, PETROBEL and Schlumberger discuss solutions to overcome flow assurance challenges in the large Zohr gas field, deepwater Egypt. For this project, an integrated multi-phase dynamic model was used to optimize operating procedures for initial well clean-up and ramp-up to production, before first gas, by testing start-up scenarios, given several well and reservoir uncertainties.
地点
Egypt, Africa
背景
This article originally appeared in the October 2021 edition of World Oil.
Publication
World Oil
文章主题
相关产物