Completion Well Construction Equipment
Seamlessly bridge the gap between drilling and completions
Drilling a wellbore is only the beginning—you have to bring the well to life.
Well construction brings workflows together to seamlessly bridge the gap between drilling and completions. We put the right information in the right hands at the right time so we can deliver a smart drilling program that maximizes accuracy, efficiency, and value—while also minimizing risks.
We develop a digital plan for intelligent drilling execution that enables efficient handoff to a digitally informed completion team for optimal hardware and fluids delivery to prepare the wellbore and the reservoir for production. The integrated preparation and analysis mean that, when challenges arise, contingencies are in place to maintain project progress and continuously improve the process from well to well.
Well construction means integrating activities, processes, people, and technology; monitoring deviations; and providing solutions that allow for dynamic changes to the plan and improving learning for the next time.
Multilateral Completion Systems
Confidently reenter existing wells to add laterals that increase reserves while minimizing investment.
-
RapidAccess
TAML 2 self-orienting multilateral junctionPrepare selective access and multiple kickoff points for current and future sidetracks and multilateral wellbores.
-
RapidMSS
TAML 2 trip-efficient, multistage stimulation multilateral junctionSave time on your completion by enabling fracturing in both the lateral bore and main bore in a single trip.
-
RapidTieBack
TAML 3 or 4 conventional multilateral junctionReduce costs with multilateral technology that is compatible with conventional completion options.
-
RapidX
TAML 5 high-strength, hydraulic-sealed multilateral junctionIsolate up to 2,500 psi [17.2 MPa] at the junction, and combine simple installation with flexibility.
-
RapidXtreme
TAML 3, 4, or 5 large-bore multilateral junctionMaximize performance with a reliable, modular large-bore junction.
-
SLIC
Selective lateral intervention completion systemEnable rigless through-tubing intervention (access or isolation) in multilateral wells.
Liner hanger system equipment
Enhance well stability and protect the casing with cemented and uncemented liner hanger systems that suit a wide range of well conditions.
Liner Hanger Systems
Running Tools
-
CRT
Hydraulic collet running toolRun liners and release without rotation—ideal in high-inclination wells.
-
RRT
Right-hand-release running toolMechanically or hydraulically set liner hanger systems that require high torque to drill the liner.
-
RCB
Retrievable cement bushingMaintain pressure integrity for liner hanger and liner top packer operations.
-
RBS Rotational Ball Seat
Simplified running and settingSave time running and setting liner hanger systems, and reduce pressure surges.
Cement Heads
Liner hanger expandable systems
Deploy long, heavy liners in challenging conditions—including deepwater, extended-reach, and HPHT wells—with expandable, metal-to-metal sealing for the life of the well.
-
Integrated Liner Hanger Tieback System
Incorporating the Colossus liner hanger system and a gas-tight metal-to-metal tiebackCombine all the benefits of running a liner with the sealing integrity of a full casing string.
-
Load anchor
Metal-to-metal anchorEliminates load transfer onto the liner hanger and tieback system
Casing Annulus Packers
-
Annular Zonal Isolation Packers
Using expandable steel technologyMinimize costs and NPT with robust expandable steel annular packers for zonal isolation in open and cased holes.
-
External Casing Packer
Robust expandable stainless steel devicesDesigned to set at low pressures to achieve zonal isolation irrespective of hole shape and condition.