Maximize, elevate, and scale data-driven decision making, with AI
Be storage confident with Sequestri carbon storage solutions
Electric solution that empowers operators to predict, adapt, and act with confidence—throughout the life of the well
Our journey to lower emissions, decarbonizing customer operations, and scaling new energy systems.
We put people first by respecting human rights, building a more inclusive workplace, and driving positive socioeconomic outcomes.
We've identified three key areas that are significant for our operations: biodiversity, water, and circularity.
Explore the latest news, stories and perspectives from 果冻传媒.
Step into energy's future with thought leaders from around the world.
Visit us at one of our upcoming tradeshows to speak directly to an expert.
Together, we create amazing technology that unlocks access to energy for the benefit of all.
Our planet needs balance to thrive, for the climate, for people, and for nature.
Published: 01/07/2013
In the early phase of their redevelopment campaign in the Auger deepwater GOM field, Shell encountered unavoidable losses due to high ECD and lower than anticipated fracture gradient. Conventional efforts to drill the narrow margins were ineffective at preventing total losses. Limited in their success to 30%, Shell sought ways to drill with lower ECD, maintain wellbore stability, eliminate losses and unplanned sidetracks, and increase their success rates.
In principle, the solution was straightforward: reduce the static mud weight below that which was needed for wellbore collapse and in so doing reduce the ECD below the fracture gradient when the rig pumps are on. However, that required an additional solution that would preserve wellbore stability by replacing the lost ECD and maintain a constant BHP when the mud pumps were turned off.
The DAPC system and HOLD RCD were key to the success of Auger redevelopment. With its fully automated, programmable control and integrated real-time hydraulics model the DAPC system achieved tighter pressure windows than expected by Shell which allowed them to extend their plans to wells with increasingly narrower margins and drill with mud that was statically under pore pressure.
Equipped with the DAPC automated manifold backpressure pump, and pressure relief choke for ECD management, a coriolis meter for kick detection, and an HOLD RCD, the system was able to control the BHP in every operational phase – while making connections, during bit trips, and on bottom Fast response minimizing pressure fluctuations The connection graph shows the ability of the DAPC system to manage the BHP even during rapid changes in pump rate. During the dynamic transition at the start of connection, shown to the right, the pumps were ramped down from 180 to 0 gpm in 75 seconds and the system minimized the BHP change to -0.11 ppg. However, at the end of the connection the pumps were initially ramped up from 0 to 30 gpm in 2 seconds. Even during such a rapid transition fluctuations in the BHP were minimized to +0.13 ppg. The charts highlight multiple rapid pump transitions at the start and end of a connection and an MWD survey during which the system managed the pressure in +/- 0.2 ppg.
The connection graph shows the ability of the DAPC system to manage the BHP even during rapid changes in pump rate. During the dynamic transition at the start of connection, shown to the right, the pumps were ramped down from 180 to 0 gpm in 75 seconds and the system minimized the BHP change to -0.11 ppg. However, at the end of the connection the pumps were initially ramped up from 0 to 30 gpm in 2 seconds. Even during such a rapid transition fluctuations in the BHP were minimized to +0.13 ppg.
The charts highlight multiple rapid pump transitions at the start and end of a connection and an MWD survey during which the system managed the pressure in +/- 0.2 ppg.
To avoid losses it was equally important to maintain constant BHP even during steady state conditions such as bit trips. The steady state graph below illustrates the system’s ability to manage backpressure continuously for two hours while the bit was pulled to the casing show. During that bit trip, the BHP fluctuated no more than +/- 25 psi.
The performance summary is the record of minimum and maximum BHP that occurred during every connection managed by the system during one of the Auger wells. In this well the system managed BHP in 30 connections during which time the static MW was reduced in stages from wellbore stability to below pore pressure. The target window for the well was +/- 0.3 ppg relative to the setpoint which changed in stages along with the MW. The DAPC system achieved +/- 0.2 ppg for 93% of the connections.
The DAPC system was a key solution in Auger redevelopment By eliminating losses, the DAPC system enabled Shell to avoid the unplanned sidetracks which had cost over USD 15 million in previously unsuccessful conventional
By eliminating losses, the DAPC system enabled Shell to avoid the unplanned sidetracks which had cost over USD 15 million in previously unsuccessful conventional
Challenge: Reduce equivalent circulating density (ECD) to eliminate lost circulation and manage constant bottomhole pressure (BHP) to maintain borehole stability while Solution: Reduce the ECD by Results: Enabled customer to drill six wells, too costly to drill conventionally, with no lost circulation or borehole instability. Controlled dynamic BHP within +/- 0.2 ppg and steady state BHP within +/- 25 psi. Minimized pump transitions to 60 to 120 seconds.
Solution: Reduce the ECD by Results: Enabled customer to drill six wells, too costly to drill conventionally, with no lost circulation or borehole instability. Controlled dynamic BHP within +/- 0.2 ppg and steady state BHP within +/- 25 psi. Minimized pump transitions to 60 to 120 seconds.
Results: Enabled customer to drill six wells, too costly to drill conventionally, with no lost circulation or borehole instability. Controlled dynamic BHP within +/- 0.2 ppg and steady state BHP within +/- 25 psi. Minimized pump transitions to 60 to 120 seconds.
A remotely operated clamping system for improved safety in wellbore fluids containment applications.
Share This