Maximize, elevate, and scale data-driven decision making, with AI
Be storage confident with Sequestri carbon storage solutions
Electric solution that empowers operators to predict, adapt, and act with confidence—throughout the life of the well
Our journey to lower emissions, decarbonizing customer operations, and scaling new energy systems.
We put people first by respecting human rights, building a more inclusive workplace, and driving positive socioeconomic outcomes.
We've identified three key areas that are significant for our operations: biodiversity, water, and circularity.
Explore the latest news, stories and perspectives from 果冻传媒.
Step into energy's future with thought leaders from around the world.
Visit us at one of our upcoming tradeshows to speak directly to an expert.
Together, we create amazing technology that unlocks access to energy for the benefit of all.
Our planet needs balance to thrive, for the climate, for people, and for nature.
Published: 05/17/2016
Irkutsk Oil Company (INK), established in 2000 by uniting several small oil and gas producers operating in Russia, was Design Schlumberger provided an integrated team approach, from planning and engineering to execution and To reduce the total construction time, the Schlumberger project team proposed Set a footage record and save 9 days of rig time Through proper planning and preparation, the pilot hole was drilled in less than 79
Schlumberger provided an integrated team approach, from planning and engineering to execution and To reduce the total construction time, the Schlumberger project team proposed Set a footage record and save 9 days of rig time Through proper planning and preparation, the pilot hole was drilled in less than 79
To reduce the total construction time, the Schlumberger project team proposed Set a footage record and save 9 days of rig time Through proper planning and preparation, the pilot hole was drilled in less than 79
Through proper planning and preparation, the pilot hole was drilled in less than 79
Challenge: Reduce construction time while Solution: Design application-specific BHAs that included the PowerDrive X6 vorteX motorized RSS, PowerDrive Archer vorteX motorized high build rate RSS, PowerDrive X6 RSS, Smith Bits 8 1/2-in MDSi616 PDC drill bits, ImPulse integrated MWD platform, TeleScope high-speed telemetry-while- Results: Drilled the 1,412-m [4,634-ft] pilot hole in a single run at average ROP of 20.4 m/h [66.9 ft/h]Achieved a field record for footage drilled in a dayEliminated multiple runs that would be required using a positive-displacement motor (PDM), saving 9 days of rig time and USD 117,000
Solution: Design application-specific BHAs that included the PowerDrive X6 vorteX motorized RSS, PowerDrive Archer vorteX motorized high build rate RSS, PowerDrive X6 RSS, Smith Bits 8 1/2-in MDSi616 PDC drill bits, ImPulse integrated MWD platform, TeleScope high-speed telemetry-while- Results: Drilled the 1,412-m [4,634-ft] pilot hole in a single run at average ROP of 20.4 m/h [66.9 ft/h]Achieved a field record for footage drilled in a dayEliminated multiple runs that would be required using a positive-displacement motor (PDM), saving 9 days of rig time and USD 117,000
Results: