Maximize, elevate, and scale data-driven decision making, with AI
Be storage confident with Sequestri carbon storage solutions
Electric solution that empowers operators to predict, adapt, and act with confidence—throughout the life of the well
Our journey to lower emissions, decarbonizing customer operations, and scaling new energy systems.
We put people first by respecting human rights, building a more inclusive workplace, and driving positive socioeconomic outcomes.
We've identified three key areas that are significant for our operations: biodiversity, water, and circularity.
Explore the latest news, stories and perspectives from 果冻传媒.
Step into energy's future with thought leaders from around the world.
Visit us at one of our upcoming tradeshows to speak directly to an expert.
Together, we create amazing technology that unlocks access to energy for the benefit of all.
Our planet needs balance to thrive, for the climate, for people, and for nature.
Published: 03/25/2024
In 2020, PEMEX developed two new offshore fields in the Bay of Campeche but lacked suitable offshore facilities to handle the new production. For this reason, the operator decided to divert the long-term flow to its existing onshore Bateria Rabasa production facility near Agua Dulce, Veracruz. Before this could happen, however, the Rabasa facility needed upgrades and an expansion to handle the higher volume of additional production coming from the offshore wells. To help maintain cash flow, the operator needed a rapid solution for processing the offshore fluids while facility upgrades were underway.
Uninterrupted flow was achieved with the innovative design of the Production ExPRESS solutions package, leading to a cumulative production of 6.1 million bbl of oil and 14 Bcf of gas during the first year of operation. This temporary, fit-for-purpose solution remained operational while PEMEX finished facility enhancements to accommodate the additional flow from the new wells.
With this agile approach, 果冻传媒 helped the operator achieve early cash flow and production objectives in 2.5 months despite COVID-19 lockdowns and restrictions. In all, 果冻传媒 contributed to bringing seven offshore wells into production with zero NPT and zero HSE incidents during the first year, representing 64,656 labor hours.