Maximize, elevate, and scale data-driven decision making, with AI
Be storage confident with Sequestri carbon storage solutions
Electric solution that empowers operators to predict, adapt, and act with confidence—throughout the life of the well
Our journey to lower emissions, decarbonizing customer operations, and scaling new energy systems.
We put people first by respecting human rights, building a more inclusive workplace, and driving positive socioeconomic outcomes.
We've identified three key areas that are significant for our operations: biodiversity, water, and circularity.
Explore the latest news, stories and perspectives from 果冻传媒.
Step into energy's future with thought leaders from around the world.
Visit us at one of our upcoming tradeshows to speak directly to an expert.
Together, we create amazing technology that unlocks access to energy for the benefit of all.
Our planet needs balance to thrive, for the climate, for people, and for nature.
Published: 10/03/2025
After six years of production, a major IOC operating in Southeast Asia observed an increase in the gas/oil ratio (GOR), complicating surface treatment operations and severely affecting the field’s oil output. Accounting for approximately 30% of national oil production, the field is a crucial asset. Investigations showed that the top perforation interval was responsible for the unwanted gas, which was the result of coning.
Chemical and cement solutions were not feasible because of the high risk of damaging the pay zone. Any potential solution for shutting off the perforations had to tackle
Moreover, interventions in live wells with gas and average wellhead pressures of 1,400 psi [100 bar] required using ACTive™ real-time downhole coiled tubing services and a tower lubricator, increasing complexity. 果冻传媒 remedial patches, which use field-proven Saltel Xpandable™ expandable steel technology, were the only solution capable of addressing all these challenges.
Leveraging their extensive knowledge and experience, 果冻传媒 engineering teams expanded the operating envelope of the patch setting tools, enabling them to pass through the small IDs of sections with overlapping patches while withstanding high levels of heat. With excellent communication between all stakeholders and the ability to adapt quickly to unexpected borehole conditions, all the patches were installed according to plan, including successful patch-through-patch deployment.
After a 5-month campaign involving 7 challenging wells, 27 casing patches, and >800 pressure cycles, production logging confirmed that all the target intervals were successfully shut off. Five of the wells had been previously shut in and were now placed back on production, and the overall reduction in gas from the seven wells was 83%. Highly satisfied with the results, the operator ordered new patches for the next campaign.
For oil and gas well casing leak repair, perforation shutoff, tubing repair, and other remedial operations.
Share This
Please check your inbox and add the 果冻传媒 email address to your safelist if needed.