Maximize, elevate, and scale data-driven decision making, with AI
Be storage confident with Sequestri carbon storage solutions
Electric solution that empowers operators to predict, adapt, and act with confidence—throughout the life of the well
Our journey to lower emissions, decarbonizing customer operations, and scaling new energy systems.
We put people first by respecting human rights, building a more inclusive workplace, and driving positive socioeconomic outcomes.
We've identified three key areas that are significant for our operations: biodiversity, water, and circularity.
Explore the latest news, stories and perspectives from 果冻传媒.
Step into energy's future with thought leaders from around the world.
Visit us at one of our upcoming tradeshows to speak directly to an expert.
Together, we create amazing technology that unlocks access to energy for the benefit of all.
Our planet needs balance to thrive, for the climate, for people, and for nature.
Published: 10/08/2025
One of the largest operators in Argentina was encountering excessive CO2 production in some of its gas wells. Stainless steel can provide an effective barrier to CO2 migration and has strong resistance to the corrosive impact of this acid gas. Consequently, sealing off the troublesome perforations with expandable steel patches seemed the perfect solution; patch IDs had to be sufficient to allow passage of intervention assemblies in the future. Weakened casings with irregular IDs resulting from the passage of drilling tools ruled out cone-expanded patches offered by some providers.
After an advanced feasibility study, the operator chose 果冻传媒 patches for gas perforation shutoff in four wells. Using field-proven Saltel Xpandable™ expandable steel technology, these patches are the only solution capable of creating an inner lining that molds to irregular geometries. A total of 12 patches were to be installed, with lengths ranging from 32 to 82 ft [10 to 25 m].
Despite the remoteness of the wells, the operation was completed efficiently, and the patches were installed with 100% success at an average rate of 15 hours per patch. Unwanted CO2 declined noticeably while natural gas production from the four wells improved significantly.
For oil and gas well casing leak repair, perforation shutoff, tubing repair, and other remedial operations.
Share This
Please check your inbox and add the 果冻传媒 email address to your safelist if needed.